Air, calculated down to the cubic meter

Ventilation design, fabrication and installation for residential complexes and commercial buildings.

Air exchange and pressure-loss calculations, equipment selection, working drawings.

Trusted by

Now underway: Abovyan Hills, the Arthur Aleksanyan wrestling school in Gyumri and the Arthur Abraham sports complex in Yerevan.

completedin progressTap a town

Sports

  • Arthur Aleksanyan Greco-Roman wrestling schoolGyumriin progress
  • Arthur Abraham sports complexYerevan, Charbakhin progress

Housing

  • Abovyan HillsAbovyanin progress

Shopping centers

  • Titan shopping centerYerevan

Schools

  • School No. 2Artik
  • School No. 2Armavir
  • Secondary schoolNor Kesaria
  • SchoolMasis
  • Secondary schoolKamaris

Industry and leisure

  • Depi Chambar campBjni
  • Gigafarm pharmaceutical companyYerevan
  • Cigaronne tobacco factoryYerevan

How we work

From the first call to fresh air

One company, all eight steps.

  1. You get in touch

    A call, a WhatsApp message or the request form.

    A call, a WhatsApp message or the request form
  2. We quote a price range

    Before we even visit the site.

    A price range before the site visit
  3. We measure on site

    Measurements, duct routes, equipment locations.

    Measuring the room and the duct routes
  4. We design — or use yours

    From scratch or based on your design.

    Ventilation working drawings on an engineer's desk, with a duct elbow and a laptop showing the design
  5. You approve

    Estimate, equipment, schedule.

    A stack of document folders and an open folder with a drawing on a meeting-room table
  6. We fabricate and deliver

    Ducts from our own shop.

    A duct fabrication shop: the spiral duct line, finished elbows and transitions on pallets
  7. We install and commission

    Our own crews and commissioning.

    Installing a red duct under the ceiling, with a lift holding a duct section
  8. You walk in — and breathe easy

    Documents at handover, then ongoing service.

    Measuring airflow at a duct grille during the handover of the system

Our own designers, fabrication shop and crews

One company handles your ventilation, from calculations to commissioning. No subcontractors.

  • In-house fabrication
  • Direct supply from China and Russia
  • Class 3 license
  • One accountable contractor
Round ducts, elbows and transitions in the shop
A burgundy duct with a supply grille under the floor slab

Inside the mechanical room

Filter, heat recovery, heating coil, fan, insulation. Tap a point to see what it is.

Air handling unit in a bright mechanical room
01FilterA bag filter cleans outdoor air and keeps dust out of the unit.

Full cycle, from calculations to service

You can order any stage on its own.

  1. Design

  2. Fabrication

  3. Supply

  4. Installation

  5. Commissioning

  6. Service

From bare concrete to a finished room

Browse the rooms: ductwork going in on the left, the same room finished on the right.

  • Indoor pool: ductwork going in under a concrete ceiling on the left, the finished pool on the rightInstallationFinished
    Swimming pool
  • Restaurant: ductwork going in under a concrete ceiling on the left, the finished dining room on the rightInstallationFinished
    Restaurant
  • Clinic: ductwork going in on the left, the finished reception area on the rightInstallationFinished
    Clinic
  • Laboratory: ductwork going in on the left, the finished lab on the rightInstallationFinished
    Laboratory
  • Café: ductwork going in on the left, the finished café on the rightInstallationFinished
    Café
  • Office: ductwork going in on the left, the finished office on the rightInstallationFinished
    Office
  • Hotel lobby: ductwork going in on the left, the finished lobby on the rightInstallationFinished
    Hotel lobby
  • Car showroom: ductwork going in on the left, the finished showroom on the rightInstallationFinished
    Car showroom
  • Classroom: ductwork going in on the left, the finished classroom on the rightInstallationFinished
    Classroom
  • Library: ductwork going in on the left, the finished library on the rightInstallationFinished
    Library
  • Pharmacy: ductwork going in on the left, the finished pharmacy on the rightInstallationFinished
    Pharmacy
  • Preschool: ductwork going in on the left, the finished preschool on the rightInstallationFinished
    Preschool
  • Pilates studio: ductwork going in on the left, the finished studio with reformers on the rightInstallationFinished
    Pilates studio
  • Spa: ductwork going in on the left, the finished spa on the rightInstallationFinished
    Spa
  • Beauty salon: ductwork going in on the left, the finished salon on the rightInstallationFinished
    Beauty salon
  • Flower shop: ductwork going in on the left, the finished shop on the rightInstallationFinished
    Flower shop
  • Art gallery: ductwork going in on the left, the finished gallery on the rightInstallationFinished
    Art gallery
  • Bakery: ductwork going in on the left, the finished bakery on the rightInstallationFinished
    Bakery
  • Commercial kitchen: ductwork going in on the left, the finished kitchen on the rightInstallationFinished
    Commercial kitchen
  • Supermarket: ductwork going in on the left, the finished store on the rightInstallationFinished
    Supermarket
  • Food court: ductwork going in on the left, the finished food court on the rightInstallationFinished
    Food court
  • Gym: ductwork going in on the left, the finished gym on the rightInstallationFinished
    Gym
  • Indoor padel court: ductwork going in on the left, the finished court on the rightInstallationFinished
    Indoor padel court
  • Airport lounge: ductwork going in on the left, the finished lounge on the rightInstallationFinished
    Airport lounge
  • Podcast studio: ductwork going in on the left, the finished studio on the rightInstallationFinished
    Podcast studio
  • Concert hall: ductwork going in on the left, the finished hall on the rightInstallationFinished
    Concert hall
  • Movie theater: ductwork going in on the left, the finished theater on the rightInstallationFinished
    Movie theater
  • Brewery: ductwork going in on the left, the finished brewery on the rightInstallationFinished
    Brewery
  • Auto repair shop: ductwork going in on the left, the finished shop on the rightInstallationFinished
    Auto repair shop
  • Factory floor: ductwork going in on the left, the finished shop floor on the rightInstallationFinished
    Factory floor
  • Warehouse: ductwork going in on the left, the finished warehouse on the rightInstallationFinished
    Warehouse
  • Data center: ductwork going in on the left, the finished data center on the rightInstallationFinished
    Data center

Who we work with

Equipment direct from manufacturers

  • Веза: Central air handling unitsCentral air handling units
  • Rowen: Supply air unitsRowenSupply air units
  • Haier: Fresh air handling unitsFresh air handling units

Vite Group is the Haier equipment supplier in Armenia.

License and warranty

Warranty
1 / 3 years
1 year on workmanship, 3 years on part of the equipment
Tenders
5 years

Tell us about your project

Phone and WhatsApp

+374 55 08 98 08

Call or message 9 AM to 9 PM

What happens next

  1. An engineer calls you back within 15 minutes to clarify the brief
  2. We calculate air exchange and select equipment
  3. You get a proposal